The Competitive BID

Goal = WIN the BID

Challenge = include everything drawn for the lowest price

Another Challenge = what if what’s drawn/designed doesn’t pass engineering (we see this often)

GC says = Just bid as drawn, we all need to bid the same design, apples to apples (doesn’t matter if apples are rotten)?

Next Step = Bid with BIG RED Flags, include an ALT that passes engineering (more expensive), and/or don’t bid at all.

What was the goal again?  Oh right…lowest price.  But, is the lowest price the best value?  Usually no.

Bring on design/build :) Custom design & engineered heavy timber frame structures.

Do the best you can + be awesome (jb)

Advertisement
Leave a comment

1 Comment

  1. tomvtw

     /  November 21, 2011

    Leave those bids/jobs for other companies to fight over and stick with what you do best. CUSTOM design. Chasing anything to the bottom of the barrel is just a waste of time.

    Reply

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 546 other followers