Home > Timber Frame Home > The Competitive BID

The Competitive BID

Goal = WIN the BID

Challenge = include everything drawn for the lowest price

Another Challenge = what if what’s drawn/designed doesn’t pass engineering (we see this often)

GC says = Just bid as drawn, we all need to bid the same design, apples to apples (doesn’t matter if apples are rotten)?

Next Step = Bid with BIG RED Flags, include an ALT that passes engineering (more expensive), and/or don’t bid at all.

What was the goal again?  Oh right…lowest price.  But, is the lowest price the best value?  Usually no.

Bring on design/build 🙂 Custom design & engineered heavy timber frame structures.

Do the best you can + be awesome (jb)

Advertisements
  1. tomvtw
    November 21, 2011 at 4:15 pm

    Leave those bids/jobs for other companies to fight over and stick with what you do best. CUSTOM design. Chasing anything to the bottom of the barrel is just a waste of time.

  1. No trackbacks yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: